Single Phase 2 Rooms Energy Metering Box for Card Meter

Type: Distribution Metering Box
Structure: Protection
Certification: ISO9001:2000, CCC, Ce
Form: All- packaged Type
Operation Voltage: Low Voltage
Size: 2 Uint
Samples:
US$ 12/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
KG - K201A
Application Range
All
Shell Material
Plastic
Installation Network
LV:AC220V, AC380V
Installation Type
Wall Mounted, Pole Mounted
Installation Location
Indoor, Outdoor
Frequency
50/60Hz
Insulation Resistance
Bigger Than 20mΩ
Main Busbar Rated Short Time Withstand C
30ka
Rated Insulation Voltage
800V
Material
PC+ABS
Protection Degree
IP44
Life Expectancy
30years
Origin
China
HS Code
3926909090
Production Capacity
5000000

Product Description

Single Phase 2 Rooms Energy Metering Box for Card Meter

Founded in 2010, Zhejiang Kangge Electric Co., Ltd is being acknowledged as one of the most respected nationwide manufacturer of meter box, waterproof box, plug, socket as well as other electric accessories in China.

Kangge owns a production area of 50, 000 square meters and more than 300 staff. During the past years, we invested abundant resources in both research and development as well as employee training programs. We could OEM products from 100g to 16000g. Our company has took the lead in applying ISO9001 Quality Management System. Many of our products are certified under international certificates, such as CE, Rohs, CCC.

We are fully aware of the fact that only "Versatile stuff, Distinctive Quality and Advanced Technology"can keep us survive and succeed in today's high competitive market. Hence, we will be with overall technology support good service to meet the requirements of the world.
Single Phase 2 Rooms Energy Metering Box for Card Meter

Q1: Are you a factory or sales company?
A: We are a factory.

Q2: When get the goods if we place an order?
A: It depends on your order quantity, 3 days for small order, 7-14 days for big order, special or urgent demands should be evaluated.

Q3: What is your accepted payment term?
A: We could accept L/C, T/T, West Union and even Paypal.

Q4: How about the transportation?
A: It depends on your demands. For small, urgent order, we could arrange the air transportation; it takes about 3-5 days on the way. For most orders, we always arrange the boat shipment through Ningbo/Shanghai port. 

 

 

Pls feel free to contact us.

 

                                        Peggy Ye

                                              Sales Manager


Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Management System Certification
ISO9001:2015, ISO14001:2015, ISO45001:2018